The short answer

Work out the volume first: square metres times depth in metres times 1.31 gives cubic yards, so 20 square metres dug to 15 cm is about 3.9. Soil and rubble are heavy, so soil / subsoil and hardcore / rubble go in skips of 8 yards or less. As a guide, skips start from £366 for a 4-yard skip, including VAT; the price for soil or rubble is shown when you choose that waste type.

How much comes out

Measure the area, measure the depth, and multiply. To see the depth, lift a slab or dig a small hole at the edge: what has to come out is every layer down to the level you are digging to, not just the surface.

Area dug out10 cm deep15 cm deep20 cm deep
10 m²1.3 cubic yards2.0 cubic yards2.6 cubic yards
20 m²2.6 cubic yards3.9 cubic yards5.2 cubic yards
30 m²3.9 cubic yards5.9 cubic yards7.9 cubic yards
40 m²5.2 cubic yards7.9 cubic yards10.5 cubic yards
50 m²6.6 cubic yards9.8 cubic yards13.1 cubic yards

These are volumes in the ground: the area in square metres, times the depth in metres, times 1.31 to turn cubic metres into cubic yards. Broken-out concrete and dug soil take up more room loose than they did in the ground, so allow for more than the table shows.

Which skips take soil and rubble

A skip is sized by volume, but the lorry lifts it by weight, and soil, concrete and rubble are heavy. That is why soil / subsoil and hardcore / rubble go in skips of 8 yards or less.

SkipHoldsGuide price (incl. VAT)
4 Yard Skip4 cubic yardsfrom £366
6 Yard Skip6 cubic yardsfrom £438
8 Yard Skip8 cubic yardsfrom £450

Guide prices are for a private-property (driveway) delivery with general mixed waste at a London postcode; the price for soil or rubble is shown when you choose that waste type. Get the price for your postcode.

A skip cannot be loaded above its sides. A skip heaped above the rim cannot be carried on the road, and under the terms a wasted journey costs £60 plus the return visit at cost.

Book the waste type that matches the load

What comes upHow to book it
Paving slabs, block paving, concrete, bricks and hardcoreBook it as Hardcore / Rubble, in a skip of 8 yards or less.
Soil, clay and subsoilBook it as Soil / Subsoil, in a skip of 8 yards or less.
TarmacAsk before you book, and say that it is tarmac, so that it is booked as the right waste type.
TurfTurf is mostly soil and weighs like it. If the load is mainly turf, ask before you book which waste type to choose.
Railway sleepers used as edgingNever, if they are treated with creosote: that makes them hazardous waste.

If soil and rubble are going in the same skip, choose the type that describes most of the load and say what else is in it when you book. Keep general rubbish — membrane, timber, packaging — out of a load booked as soil or rubble: a skip that does not match its description is re-weighed and re-charged.

A skip or a grab lorry

A skipA grab lorry
How it worksIt stands on site and you fill it as you digYou pile the spoil in a heap; the lorry loads it with its arm and leaves
How muchUp to 8 cubic yards of soil or rubble in each skipAn 8-wheel grab carries about 16–18 tonnes, about 20 cubic yards
What it needsSomewhere to stand for the whole jobThe heap within about 6 m of the lorry, about 10 m of road at the kerb, and nothing overhead: no lifting under or near power lines
SuitsA dig done over several days, or a small oneA large heap, ready to go

A grab lorry's load and reach are typical figures for the class of vehicle, not a specification. We price it when you tell us the postcode and what the heap is: enquire about grab hire. Grab hire or skip hire.

Where the skip stands while you dig

If the drive is what you are digging up, the skip has to stand somewhere else: on a part you are not digging, or on the road. A skip lorry needs about 12 m in a straight line, 3 m wide, with 4.5 m clear overhead — typical figures for UK vehicles.

On your own drive or land there is nothing to arrange. If the skip has to stand on a public road it needs a council permit, which is arranged for you and shown as its own line in the price before you pay; each council sets its own fee and notice period. The fee for every council, and the options if you have no drive.

A skip full of rubble is very heavy. Under the terms, ground off the public highway is at your risk — neither we nor the carrier is liable for damage to it unless it was caused by the carrier's negligence — so say before the day if the ground is soft, sloping or newly laid.

Where these figures come from

The skip sizes and prices are our own, read from our catalogue and updated about hourly, and the sizes soil and rubble may go in are the ones the booking enforces. The volumes in the first table are arithmetic, not a survey: measure your own job. A grab lorry's load and reach, and the room a skip lorry needs, are typical figures for UK vehicles.

Questions

Asked about this.

How much soil and rubble comes out of a driveway or patio?

Multiply the area by the depth. In cubic yards it is the area in square metres, times the depth in metres, times 1.31: 20 square metres dug to 15 cm is about 3.9 cubic yards, and 50 square metres dug to 20 cm is about 13.1. That is the volume in the ground. Broken up and loose it takes more room, so allow for more.

What is the biggest skip I can put a dug-up driveway in?

With Waste Central, soil / subsoil and hardcore / rubble go in skips of 8 yards or less. The limit is weight, not space: a bigger skip full of soil or rubble is more than the lorry can lift. For more than that, book a second skip or a grab lorry.

Can I put paving slabs and concrete in a skip?

Yes. Slabs, block paving, concrete and bricks all go in a skip, booked as the waste type that describes them. They are heavy, so the size is limited: with Waste Central, soil / subsoil and hardcore / rubble go in skips of 8 yards or less. Break large pieces up so that they lie flat, and keep the load level with the sides.

Can I put tarmac in a skip?

Ask before you book, and say that it is tarmac. A skip is booked for a waste type, and the load has to match it, so Waste Central needs to know what the surface is before saying which type to book and what it costs.

Is a grab lorry better than a skip for digging up a driveway?

It depends on the size of the dig and on how it is done. With Waste Central a skip stands on site and is filled as the work goes, up to 8 cubic yards of soil or rubble at a time. A grab lorry takes a heap in one visit — an 8-wheel grab carries about 16–18 tonnes, about 20 cubic yards — but the heap has to be within about 6 m of where the lorry stands, and loose, not bagged.

Can the skip stand on the driveway I am digging up?

Only on a part you are not digging. Otherwise it stands on the road, where it needs a council permit: booked with Waste Central, the permit is arranged for you and shown as its own line in the price before you pay. A skip of rubble is very heavy, and under Waste Central's terms ground off the public highway is at the customer's risk unless damage is caused by the carrier's negligence.

How much does a skip for a driveway or patio cost?

With Waste Central, guide prices are £366 for a 4-yard skip, £438 for a 6-yard skip and £450 for an 8-yard skip, including VAT, for a private-property (driveway) delivery with general mixed waste at a London postcode. One price covers delivery, the hire, with no fixed period, collection and disposal. An item that has to be declared, and a council permit if the skip stands on a public road, are each added as their own line before payment. Enter a postcode on Waste Central's price page for the price there. Guide prices are for general mixed waste: the price for soil or rubble is shown when that waste type is chosen.

Do I need a permit for a skip while I dig up my drive?

Only if the skip stands on a public road, pavement or verge. On your own drive or land none is needed. Booked with Waste Central, a permit is arranged for you when you choose the public-road option, and it is shown as its own line in the price before you pay.

Get your price.